26-07-2016 00:05 via jsonline.com

MMSD earmarks $14.1 million for work in flood control area

MMSD will spend $14.1 million in the next two years to build storm sewers and complete two storm water storage basins, as part of a flood control plan for the 30th St. industrial corridor.
Read more »