21-10-2016 00:38 via toledoblade.com

Port Clinton bridge closure postponed to October 2017

PORT CLINTON — Replacement of the State Rt. 163 drawbridge in Port Clinton, which was scheduled for November, has been postponed to October 2017 through May 2018.
Read more »