30-10-2016 00:15 via topix.com

ODOT reopens southbound I-75 in Toledo

A portion of I-75 south between Berdan and the I-475 split that was shut down on Friday was reopened on Saturday afternoon, a full day and a half before it was scheduled to be reopened. This closure began at 9 p.m. on Friday and was scheduled to last until 6 a.m. on Monday morning.
Read more »