22-04-2017 07:59 via sacramento.cbslocal.com

Highway 50 Bridge Resurfacing Has To Be Fixed, Again

SACRAMENTO (CBS13) — Get ready for roadwork on a busy Sacramento bridge after Caltrans officials say resurfacing done just three years ago will have to be redone.
Caltrans says a multimillion resurfacing job on the Highway 50 bridge over the Sacramento River between Sacramento and West Sacramento has to be completely redone.
The cost of the project could be three times as much, because of the change in materials that have to be used.
The Pioneer Bridge itself isn’t in dange
Read more »