Construction Delays To South Sacramento Pedestrian Bridge Have Parents Concerned
SACRAMENTO (CBS13) — A pedestrian bridge in South Sacramento is under construction and the delayed project is causing concern among parents and school staff in the area.
“If it was our kid, there is no way he’d get near that,” said Martin Aguirre talking about the torn open gate to the bridge between 47th Street and Florin Road across Highway 99.
The important bridge, which connects two neighborhoods, is causing travel troubles for people and especially students tryi
Read more »