As Summer Ends, The Barn Is Behind Schedule
WEST SACRAMENTO (CBS13) — As summer comes to a close there’s a part of the city’s waterfront that’s been a bit of a disappointment, The Barn.
The oblong shaped wooden structure sits along the Sacramento River just down the road from Raley Field. It was supposed to be the jewel of the city’s waterfront.
Last year there was a vibrant scene with people people packing in to the outdoor event space enjoying food and concerts, but this summer the scene is much different.
Read more »