06-11-2019 11:08 via pittsburgh.cbslocal.com

Saw Mill Run Boulevard Back Open After Shaler Street Bridge Installation

PITTSBURGH (KDKA) — Saw Mill Run Boulevard is back open in both directions.
The three-day closure began Sunday between the Parkway West and West End Circle.
PennDOT says The new sections of the Shaler Bridge were moved into place by two large construction vehicles.
Stick With KDKA For Any Further Updates
Read more »