Longfellow Bridge Construction Schedule
MassDOT’s contractor, White-Skanska-Consigli JV (WSC), will close the Longfellow Bridge to all vehicular traffic overnight on Wednesday, February 1, through Friday, February 3. The bridge will be closed from 11:00 PM each night to 5:00 AM the following morning. The closures are necessary to work on a MBTA fence using a crane placed on the upstream roadway. Bicycle and pedestrian traffic and the MBTA Red Line will be maintained across the bridge at all times. Bicyclists, both inbound and ou
Read more »