27-10-2022 22:02 via cityofmadison.com

E. Washington Avenue at Blair Street Reopens

(MADISON, Wis.)— As the Blair Street South project approaches the end of the 2022 construction season, the outbound lanes of E. Washington Avenue (south side of the median), between Franklin Street and Blair Street, have reopened.
“The timeline of this project continues to trend in a positive...
Read more »