28-10-2022 12:05 via staradvertiser.com

Rail utility work along Dillingham Boulevard to last over 3 years

A three-year slog up and down Dillingham Boulevard with round-the-clock construction taking up one side of the major thoroughfare between Kalihi and Iwilei is set to begin in November.
Read more »