28-06-2017 23:08 via denver.cbslocal.com

Cleanup Plans Proposed For Colorado’s Eagle Mine Site

DENVER (AP) — State and federal officials have proposed two cleanup initiatives for the existing Eagle Mine Superfund site in the Colorado mountains.
The plans announced Wednesday are designed to reduce contaminants flowing into the Eagle River and to clean up the soil before a proposed housing development is built.
The Eagle Mine dates to 1879 and operated until 1984. The site also included a mill, a retention pond and piles of waste rock and material left over after the ore was refined.
Read more »