09-05-2017 04:59 via kxan.com

Prepare for more delays with 183 South project construction

AUSTIN (KXAN) — The Central Texas Regional Mobility Authority (CTRMA) says it’s the story people aren’t talking about. Fixated on MoPac, instead of another massive undertaking: The 8-mile 183 South project.The project will transform the corridor many people use to get to and from the airport into an expressway with three lanes in each direction. And it will include toll lanes.
The prime time for construction work is after 8 p.m. or before 6 a.m. So for drivers using t
Read more »