20-12-2017 21:37 via kxan.com

Final major recovery project from Hays Co. Memorial Day floods wraps up

SAN MARCOS, Texas (KXAN) – Ahead of schedule and on budget, the Post Road Bridge over the Blanco River is back open to traffic. The bridge was decimated by the 2015 Memorial Weekend flood.
A temporary one-lane bridge was installed for residents to use while officials worked to build a permanent one. In July, two years after the flood, Hays County closed the bridge and began permanent repairs.
The new bridge is two lanes wide and has 4-foot shoulders, and built within a $900,000 budget.
&ld
Read more »