11-05-2022 08:53 via constructionenquirer.com

Taylor Wimpey to tear down half-built £48m Hackney Wick scheme

Taylor Wimpey is preparing to demolish a half-built development of 148 flats in east London after “a potential structural issue” was discovered in the concrete frame.
Construction work was halted last year on The Factory scheme in Hackney Wick which was granted planning permission in 2019.
The £48m mixed-use scheme is designed to reach seven storeys across the site near the Queen Elizabeth Olympic Park.A Taylor Wimpey spokesperson said: “Following the discovery of a poten
Read more »