02-12-2024 08:09 via constructionenquirer.com

Redesign needed on Colas “bridge to nowhere”

Technical issues on the delayed A46 Stoneleigh Junction have forced a design change to try and get the job finished.
Main contractor Colas-Siac joint venture was awarded the £38m scheme in 202o by Warwickshire County Council in 2020 with an original completion date of Summer 2022.
But the job has been hit by problems leaving the “bridge to nowhere” across the A46 still unconnected at each end as costs continue to escalate with no finish date in sight.In its latest update the co
Read more »