Operator spots cracked mast on Hinkley tower crane
Serious structural defects in a tower crane at Hinkley Point C have prompted nuclear safety regulators to issue a formal improvement notice to the project’s main contractor.
The faults were uncovered in February when a crane operator spotted a failed connecting pin and visible cracks in a mast section during routine pre-use checks on the Somerset site.
The incident, reported under RIDDOR, did not lead to any injuries or collapse, but the discovery raised red flags over equipment safety man
Read more »