13-03-2025 16:08 via constructionenquirer.com

Mace confirmed for £140m Gatwick Airport Pier 6 extension

Mace has been confirmed as main contractor for the planned £140m extension to Pier 6 at London Gatwick Airport.
The extension will add a further eight aircraft gates to the existing passenger building, which previously was built with 11 gates connected by the elevated airbridge built by Mace back in 2005.
When complete in 2027, the new gates adjacent to the airport’s runways will enable seven and a half million passengers to alight and depart directly onto aircraft each year, saving
Read more »