05-08-2022 08:07 via constructionenquirer.com

Demolition starts on half-built £48m Taylor Wimpey flats

Local residents are raging over disruptive demolition work on their doorstep where Taylor Wimpey has started tearing-down a half-built development of 148 flats in east London.
Construction work was halted last year on The Factory scheme in Hackney after “a potential structural issue” was discovered in the concrete frame.
Taylor Wimpey decided to demolish the existing concrete structures and specialist Erith is now on site.But local residents claim they have not been consulted by the
Read more »