Concrete frame problems cost Barratt again
House builder Barratt has set aside another £192m to cope with legacy building problems.
The extra costs include £130m for further work to “developments previously identified as potentially requiring remediation work, which have been previously disclosed. ”
Barratt conducted a review of completed reinforced concrete frame buildings after design defects were discovered at its Citiscape project in Croydon, south London.It said the work “relates to the remediation of t
Read more »