13-02-2025 09:13 via constructionenquirer.com

Balfour Beatty wins Trent arched bridge job

Balfour Beatty has clinched the £12.6m delivery contract to build a new bridge over the River Trent in Nottingham.
The 85m-long pedestrian and cycle bridge will be the first bridge built in the city since the 1950s.
It will link the north side of the river where the new Trent Basin community of 350 homes continues to take shape, and the south side of the river with sports facilities and riverside walks.The bridge will be one of the longest single-spanning network arch bridges for pedestria
Read more »