5,000-home Royal Docks mega scheme set for 2028 start
Dubai-based developer Arada has accelerated plans for its £2.5bn Thameside West regeneration in London’s Royal Docks aiming to start construction in early 2028.
The developer has confirmed architect Gensler, engineer Arup and landscape designer Planit are leading the professional team on the opening phase of the 5,000-home waterfront scheme.
It aims to submit a planning application later this summer for the first stage, which will deliver 1,500 homes across six buildings.The 47-acre
Read more »