29-05-2024 12:15 via dezeen.com

Chatillon Architectes completes Grand Palais restoration ahead of Paris Olympics

French studio Chatillon Architectes has completed its restoration of the vast glass-roofed atrium at the Grand Palais, which will host fencing and taekwondo at the Olympic Games in Paris this summer
It marks the end of the first phase of renovation work at the landmark structure, carried out by Chatillon Architectes in time for the Paris 2024 Olympic Games.
The sporting event will be held in the revamped atrium, or nave, where swathes of glass and an expansive structure of over 6,000 tonnes
Read more »