18-08-2026 16:05 via newsroom.shropshire.gov.uk

Closure of Tetchill Bridge for repair work

Tetchill Bridge – which carries the C1029 over the Tetchill Brook – will be closed for repairs from 7 to 30 September [2026].
The work involves the installation of a concrete liner with application of a paint system, the construction of concrete down stands to both the upstream and downstream ends, new parapet posts to be installed with a replaced steel mesh infill panel to the parapet, and general vegetation removal from the structure.
To carry out the proposed work safely it will
Read more »