Surbiton station set for an upgrade to cope with congestion
This month, work will start at Surbiton station to add a new deck to the existing footbridge at the ‘London end’ of platforms 3 and 4, along with eight additional ticket gatelines, accessed by a new staircase.
The station has two central island platforms and a large footbridge that then leads to two exits on either side of the railway.
Surbiton station (c) Google satellite view
The station is currently the eighth busiest on the Wessex route, and in the evening peak hours, there can b
Read more »