HS2 to cut Euston station to ten platforms
Plans for HS2’s station at Euston to be built in two stages and to have 11 platforms have been changed by the government to a slightly smaller station with ten platforms, to be built in one single phase.
The decision to cut Euston station down to ten platforms was revealed in the six-monthly report released by HS2 minister Andrew Stephenson earlier today.
HS2 concept image – not finalised design
The original plan had been to build the HS2 Euston station in two phases, with phase one
Read more »