26-06-2025 14:00 via rigzone.com

Var Energi Starts Production at Jotun FPSO at Balder Field

Within three to four months after the start of production, Var Energi expects to raise production by approximately 80,000 barrels of oil equivalent per day (boepd) gross.
Read more »