18-03-2024 09:29 via fmj.co.uk

Style repairs 7m high moveable wall

A major conference centre in the North of England called the engineering maintenance team at Style to repair the 7 metre high moveable wall that divides the cavernous space. Manufactured in two sections, the damaged panels needed to be uncoupled to allow adjustments to be made to the internal mechanism, where acoustic integrity had been compromised, and then the engineers re-coupled the panels and fully tested the acoustic seals.“For a conference venue hosting more than one event, it is bo
Read more »