Photovoltaics are still running after a year under Swiss trains
It is just over a year since a pilot project to install photovoltaics on a railway line kicked off. According to the CEO of Sun-Ways, the company behind the scheme, the challenge was not so much technical as regulatory. The project, a 100-meter photovoltaic installation on a railway line open to traffic, was inaugurated on April 24, 2025 in Buttes, Switzerland. It's fair to say it went well; the 48 solar panels wedged between the tracks have generated more than 19 MWh to date. According to the c
Read more »