24-09-2018 09:17 via centreforaviation.com

Tiruchirappalli Airport integrated terminal works underway - CAPA - Centre for Aviation

Tiruchirappalli Airport integrated terminal works underway
CAPA - Centre for Aviation
Airports Authority of India (AAI) engineering GM Sanjeev Jindal reported the authority commenced work to develop a 61,634sqm integrated passenger terminal at Tiruchirappalli Airport (TNN, 24-Sep-2018). Mr Jindal said the terminal will be equipped to ...and more »
Read more »