10-10-2018 01:13 via vancouversun.com

TransLink to repair or replace 20 per cent of Pattullo Bridge's railing posts

About 20 per cent of the railing posts on the Pattullo Bridge need to be immediately repaired or replaced, according to an inspection report prepared for TransLink.
The transit authority, which is responsible for the operation and maintenance of the 80-year-old bridge, inspects the railings once a year and does repairs as necessary.
“One area of the bridge which we’ve known for a while is deficient is the condition of the railings,” said Jeff Busby, TransLink’s director o
Read more »