Inspectors found problems with concrete work at LRT sites, new reports show
Inspectors have found a range of problems with concrete work at the city’s LRT sites, according to newly released inspection reports that offer a behind-the-scenes look at Ottawa’s biggest infrastructure project.
The problems relate to concrete pours at worksites such as unacceptable temperatures and missed durability tests, and have forced contractors to sometimes redo work or come up with workarounds.
The city finally released the 63 reports to Ken Rubin after he successfully convi
Read more »