Adam: Don't let the Ottawa airport LRT link become a white elephant
Lost in all the controversy surrounding the award of the Trillium Line contract to SNC-Lavalin is the flawed design of the airport link, and the real possibility it could become a white elephant.
It must be clear to everybody that the way this link is planned right now, with its multiple transfers, the airport train will become a slow coach to nowhere. Few, if any, arriving passengers would use a service that requires three trains to get downtown. Same with travellers downtown trying to catch a
Read more »