Callander upgrades critical wastewater infrastructure
Callander is investing just over $33,000 to replace infrastructure critical to the town’s water systemThe sewage lift station on Cranberry Road needs a new pump control panel, and replacing it will cost an estimated $33,176, which will be included in the Municipality’s 2027 wastewater capital budget.The pump control panel has been experiencing frequent failures, Callander’s Chief Administrative Officer Sabrina Pandolfo detailed in a report to council. Installed in 2010, the pa
Read more »