Portion of Coastal GasLink construction paused over erosion, sediment control issues
TC Energy Corp. says it has proactively halted construction on a 20-km stretch of its Coastal GasLink project over concerns about erosion and sediment control. The Calgary-based pipeline company says the affected section of pipeline is located near the Little Anzac River north of Prince George, B.C. TC Energy says the region has been affected by challenging spring melt conditions caused by an abundance of snow this winter, a quick spike in temperatures, and heavy rainfall. The Coastal GasLink pi
Read more »