Alberta Utilities Commission blocks Westlock solar project
A proposed solar plant north of Westlock was originally slated to be operational by December, but after months of review, the Alberta Utilities Commission (AUC) has decided the project won’t be built.Sign up for breaking news alerts from CTV News Edmonton, right at your fingertipsAcestes Power ULC applied to build the 24-megawatt solar plant in 2023, which it claimed would generate enough electricity annually to power about 7,000 homes. On Oct. 11, the AUC ruled that the company had failed
Read more »