01-12-2024 00:47 via abc.net.au

Pumped hydro project awaits grid connection to power coastal town during blackouts

The developer of Walpole's recently completed pumped hydro project is waiting for the project, which he says is designed to kick in when a blackout or brownout hits the small coastal town, to be connected to the grid.
Read more »